build a house in Oxford

Quality construction and design can take time. If you are in a rush, this is probably not the best option for you.

Let’s assume that you have already covered the costs of buying a home. The major positive benefit to building is that it allows you to slowly pay for the home as you build.

Build a house in Oxford

It’s a great way to get the home you always wanted. Personally, I chose to build my home years ago, and it was a wonderful experience. In some cases, getting an early start on a planned development is a great way to build marketable value in your home as the surrounding lots build.

That said, quality construction takes time. Renovation TV shows give the false hope of speedy builds, but this is rarely the case. This national survey conducted by the Census Bureau discusses the nuances of new construction.

Once the land is prepared for building, the building process will likely take three to four months to complete. Delays can occur for weather, design changes, and construction supply shortages. The style of the home and size of structure are also factors in determining the build time.

A 2014 Survey of Construction (SOC) study from the Census Bureau showed an average completion time of a single-family house is roughly 7 months. Authorization to start build was usually around 25 days. Then, 6 months were needed to finish the construction.

house design ideas

It may look perfect to you, but was it done correctly?

Design ideas

Here are some design ideas for your next build.

Home inspection is a must on a new build

Following the build, always get a home inspection. Even though it’s new construction, there can still be problems with installation of appliances, roof, building codes, etc. Don’t skip it even if you are paying for it!